Cause all that matters here is passing the Oracle 1z0-1057 exam. Cause all that you need is a high score of 1z0-1057 Oracle Project Portfolio Management Cloud 2021 Implementation Essentials exam. The only one thing you need to do is downloading Passleader 1z0-1057 exam study guides now. We will not let you down with our money-back guarantee.
Also have 1z0-1057 free dumps questions for you:
NEW QUESTION 1
Identify three correct statements about the integration of Primavera P6 Enterprise Project Portfolio Management and Oracle Project Portfolio Management Cloud. (Choose three.)
- A. Event completion flows from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- B. Billing events flow from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- C. Summarized actual quantity and cost flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
- D. Projects and task definitions flow from Oracle Project Portfolio Management Cloud to Primavera P6Enterprise Project Portfolio Management.
- E. Project plans and progress flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
Answer: ACD
Explanation:
Ref: https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125394AN6D254.htm
Primavera P6 Enterprise Project Portfolio Management and Oracle Fusion Project Portfolio Management: How They Work TogetherUse Oracle Fusion Project Integration Gateway to integrate Oracle Fusion Project Portfolio Management with Primavera P6 Enterprise Project Portfolio Management. The integration enables project accountants, project billing specialists, and executives to centrally perform project costing, billing, accounting, and executive reporting tasks in Oracle Fusion Project Portfolio Management while enabling each project manager to perform detailed project planning and scheduling in Primavera P6 Enterprise Project Portfolio Management.
Oracle Fusion Project Integration Gateway ensures data security, integrity, and efficiency by defining a set framework in which data is exported from and imported into Oracle Fusion Project Portfolio Management.
The following table and diagram provide an overview of the flow of information.
Information Type From Application To Application
Global integration information
Oracle Fusion Project Portfolio Management Primavera P6 Enterprise Project Portfolio Management Projects and task definition
Oracle Fusion Project Portfolio Management Primavera P6 Enterprise Project Portfolio Management Summarized project actual quantity and cost
Oracle Fusion Project Portfolio Management Primavera P6 Enterprise Project Portfolio Management Project plans and progress
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management Billing events
Oracle Fusion Project Portfolio Management Primavera P6 Enterprise Project Portfolio Management Event completion
Primavera P6 Enterprise Project Portfolio Management Oracle Fusion Project Portfolio Management
NEW QUESTION 2
You recently made some changes to a project contract and the current status of the contract is Under Amendment. Identify the correct sequence of activities that can take place on that contract. (Choose the best answer.)
- A. On Hold > Pending Acceptance > Active
- B. On Hold > Pending Approval > Active
- C. Pending Approval > Pending Acceptance > Active
- D. Pending Acceptance > Pending Approval > Active
Answer: C
Explanation:
Reference https://docs.oracle.com/cloud/latest/common/FASCC/FASCC1124283.htm Topic - Contract Actions and Status Changes: Explained
NEW QUESTION 3
Identify the valid approval group type applicable to Oracle Project Financial Management Cloud. (Choose the best answer.)
- A. Position
- B. Dynamic
- C. Static
- D. Flexfield
- E. Job
Answer: C
Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-approval-management.html#FACI
NEW QUESTION 4
Using Oracle Time and Labor, your client wants to put in a validation process that allows only a certain number of maximum hours an employee can charge in a day, and a minimum of hours he or she can report in a week.
What feature would you use to meet this requirement? (Choose the best answer.)
- A. project time validation rules
- B. time calculation rules
- C. time entry rules
- D. time audit rules
Answer: C
NEW QUESTION 5
You have a small project for a period of five months. Your budget amount for each month is spread evenly and is $1000 per month. The first month actual expense is $800 and there is a commitment for $600. Now you generate a forecast at the beginning of the second month. Identify the monthly Estimate-To-Complete (ETC) amount that the application would calculate for the remaining four periods, when the ETC generation method includes commitments. (Choose the best answer.)
- A. 1000B.-900C.800D.600
Answer: B
Explanation:
Budget 5,000Actuals 800Commitment 600 ETC = Budget – Actuals – Commitment
ETC = 5,000-800-600 = 3,600 Budget available for next 4 months = 3,600/4 = 900/month
NEW QUESTION 6
Your client uses Resource Breakdown Structures (RBS) and Resource Mapping to associate amounts to resources. After making some changes to the resources at project level, forecasts are regenerated. After reviewing the cost amounts associated with the resources, you suspect that the cost association does not match your client's expectations. Identify two valid rules based on which cost association works. (Choose two.)
- A. If one branch contains a user-defined resource type, precedence is given to the branch that contains auser-defined resource type.
- B. If a transaction maps to more than one level, Oracle PPM Cloud sums the precedence numbers for all resource type in the branch and gives precedence to the resource element in the branch with the highest sum.
- C. If there is only one level in RBS to which the transaction maps, the cost amounts are mapped to that level.
- D. If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
Answer: CD
Explanation:
Reference https://docs.oracle.com/cd/E37583_01/doc.1116/e22598/F458900AN13D82.htm
How Resource Mapping Is Calculated
You can track the cost impact of every resource that has been assigned to a project task and use the resource breakdown structure to view the breakdown of these costs. Oracle Fusion Projects associates the costs of the resources used for tasks with branches and levels in the resource breakdown structure. The process for determining the correct association is managed by rules of precedence.
Oracle Fusion Projects uses the following rules to associate cost amounts with resources:
Select the lowest level in the resource breakdown structure to which a transaction can map.
If there is only one level to which the transaction maps, the cost amounts are mapped to that level.
If the transaction maps to more than one level, Oracle Fusion Projects sums the precedence numbers for all resource types in the branch and gives precedence to the resource element in the branch with the lowest sum.
If more than one branch has the lowest precedence number at the lower level, the application uses the precedence number of the next level up.
If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
If one branch contains a user-defined resource type, precedence is given to the branch that does not contain a user-defined resource type.
Note Oracle Fusion Projects gives more precedence to a lower precedence number. For example, a resource element with a precedence number of 1 is given precedence over a resource element with a precedence number of 10.
NEW QUESTION 7
Which two statements are true about a project in “Draft” status? (Choose two.)
- A. Project managers can view draft projects on the Project Manager Dashboard and use the projects for requirements planning.
- B. Project managers can neither view draft projects on the Project Manager Dashboard nor use the projects for requirements planning.
- C. Team members can see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
- D. Team members cannot see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Answer: AD
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPEM/OAPEM1122096.htm The following table lists the project statuses and what you can do with projects in that status. Project Status
What you can do? Draft
Project managers can view draft projects in the Project Manager Dashboard and use the projects for requirements planning.
Team members can't see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Active
Project managers can view active projects in the Project Manager Dashboard and use the projects for requirements planning, project execution, and reporting.
Team members can view task assignments on active projects on the Team Member Dashboard and My Work area.
Pending Close
Project managers can view pending projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on pending projects on the Team Member Dashboard and My Work area.
Submitted
Project managers can view submitted projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on submitted projects on the Team Member Dashboard and My Work area
Closed
Project managers can't view closed projects in the Project Manager Dashboard or use the projects for requirements planning, project execution, and reporting.
Team members can't view tasks of closed projects on the Team Member Dashboard or in the My Work area.
NEW QUESTION 8
Your organization performs revenue recognition based on the Labor and Non-labor Burden schedule types. Identify the setup required to enable this kind of revenue recognition. (Choose the best answer.)
- A. Create a revenue method with a revenue method classification of Amount Based.
- B. Create a revenue method with a revenue method classification of Rate Based.
- C. Create a revenue method classification with a revenue method of Percent Spent.
- D. Create a revenue method classification with a revenue method of Percent Complete.
Answer: B
NEW QUESTION 9
Which two statements describe how the Resource Qualification Score is calculated?
- A. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification.
- B. An individual's score is 100% if the resource request has a qualification, but no proficiency is specified, and the resource has the qualification.
- C. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency.
- D. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification with a proficiency that is lower or higher than specified.
Answer: CD
NEW QUESTION 10
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)
- A. Class codes should be associated with a related set code.
- B. Class categories should be assigned to business unit.
- C. Class categories should be assigned to project type.
- D. Class codes should be assigned to project unit.
Answer: AC
Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuratio
NEW QUESTION 11
Your organization has been awarded a new contract based on which you are allowed to sell:
Items not tracked in inventory
Inventory items
Services
Which contract structure would fulfill your requirement of item sales? (Choose the best answer.)
- A. Create two contract lines with a line type each of “free-form, project-based buy agreement” and “bundle sell, project-based”.
- B. Create two contract lines with a line type each of “sell intent, free-form, project-based” and “sell intent, item, project-based”.
- C. Create two contract lines with a line type each of “product, project-based, sell agreement, standalone” and “sell intent, item, project-based”.
- D. Create two contract lines with a line type each of “sell intent, item, project-based’ and “subscription, project-based, sell”.
Answer: B
NEW QUESTION 12
Your administrator creates maintenance conditions on the Maintain Project Enterprise Labor Resources page. An HCM person is included in a condition with a process order value of 1 and, additionally, there are three other conditions, all with a process order value of 10. Identify two correct statements about the Maintain Project Enterprise Labor Resources process as it relates to process order values. (Choose two.)
- A. The process creates a resource by using the conditions with a process order value of 10 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
- B. For the three conditions that have the same process order value of 10, the records are processed inascending alphabetic order based on the condition name.
- C. For the three conditions that have the same process order value of 10, the records are processed in ascending numeric order based on the condition name.
- D. The process creates a resource by using the condition with a process order value of 1 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
Answer: BD
NEW QUESTION 13
You are trying to create a project purchase order (PO) but you are unable to select Expenditure Organization in the PO. Identify two reasons for this problem. (Choose two.)
- A. The organization is not classified as a project-owning organization.
- B. The organization is not classified as a project expenditure organization.
- C. The organization is not included in the organization tree that is assigned to the business unit that owns the PO.
- D. The organization is classified as a project unit.
Answer: BC
Explanation:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf Chapter 3 – Define Project Organizations Page # 12
NEW QUESTION 14
Which three tools are available for accessing REST APIs?
- A. cURL
- B. Web Browser
- C. Oracle Transactional Business Intelligence
- D. Programming Language
Answer: ABD
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/18b/fapap/Use_cURL.html REST API = REpresentational State Transfer (REST) Application Programing Interface (API)
NEW QUESTION 15
Identify two correct role templates available on the Oracle Entitlement Server to generate roles for Project Organization Security. (Choose two.)
- A. Project Manager Template for Project Organization Security
- B. Project Administrator Template for Project Organization Security
- C. Project Creator Template for Project Organization Security
- D. Project Accountant Template for Project Organization Security
- E. Project Billing Specialist Template for Project Organization Security
Answer: BC
Explanation:
Reference
https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/faser/implementing-security-in-oracl
Ref to “Securing Project Financial Management and Grants Management Applications”
Table lists predefined enterprise roles and the type of security that grants the role access to data in a work area or dashboard.
Enterprise Role
Work Area or Dashboard Data Security Based On Project Accountant
Asset
Project business unit Project Accountant Costs
Project expenditure business unit Project Accountant
Revenue
Contract business unit
Project Administrator
Project Financial Management Project business unit
Project organization Project Billing Specialist Invoices
Contract business unit Project Creator
Project Financial Management Project business unit
Project organization Project Management Duty
Project Management Infolet Dashboard Project assignment
Project Management Duty Project Performance Dashboard Project assignment
Project Manager
Project Management Infolet Dashboard Project assignment
Project Manager
Project Performance Dashboard Project assignment
Project Manager Project Management Project assignment
Project Manager
Project Manager Dashboard Project assignment
Project Team Member
Project Financial Management Project assignment
Grants Accountant Invoices
Contract business unit Grants Accountant Revenue
Contract business unit Grants Administrator Awards
Contract business unit Grants Administrator Contracts
Contract business unit Grants Administrator
Project Financial Management Project business unit
Principal Investigator Awards
Award assignment Principal Investigator
Contracts
Award assignment Principal Investigator
Project Financial Management Project assignment
NEW QUESTION 16
Your client organization has recently undergone a restructuring exercise that has resulted in the creation of new jobs. The Resource Breakdown Structure (RBS) was previously created with existing jobs, and now the new jobs have been added to the existing Resource Breakdown Structure.
Identify the correct statement about the RBS and new resources. (Choose the best answer.)
- A. If the “Allow resource changes at project level” option is set to No, the new resources and resource formats that are added to a Planning Resource Breakdown Structure for one project are not available for other projects.
- B. If the “Allow resource changes at project level” option is set to No for the RBS, then the resources added to the Planning Resource Breakdown Structure are automatically available for use on the projects.
- C. If the “Allow resource changes at project level” option is set to Yes for the RBS, the new resources are available automatically at project level.
- D. If the “Allow resource changes at project level” option is enabled for the RBS, the new resources added at project level are automatically reflected in the RBS.
Answer: B
Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/implementing-project-financial
NEW QUESTION 17
You create a contract with two contract lines: Line 1 and Line 2. You create separate bill plans: A for contract Line 1 and B contract for Line 2, with a different bill set number (11 for Bill Plan A and 22 for Bill Plan B).
Then Bill Plan A is allocated against Project X – Task 10, and Bill Plan B is allocated against Project Y – Task 30.
Based on the preceding setup, you are generating invoices. Identify two correct statements about invoice generation in this scenario. (Choose two.)
- A. Both the contract lines create only a single invoice because they are using the same contract.
- B. Two invoices are created using the same contract.
- C. Bill set number drives the grouping of transactions.
- D. Invoice generation does not depend on bill pla
- E. The invoices are created based on the contract line.
Answer: BC
Explanation:
Ref: https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087456AN1006D.htm
What's a bill set?
Transactions originating from different bill plans with the same bill set number on a contract are included on the same invoice. If a contract has multiple bill plans and each have different values for the bill set, Oracle Fusion Project Billing creates a separate invoice for each bill plan
NEW QUESTION 18
Which three file-based data imports are available for use in Oracle Project Portfolio Management Cloud?
- A. Project Budgets
- B. Project Tasks
- C. Project Billing Events
- D. Project Templates
Answer: ABC
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oefpp/toc.htm
NEW QUESTION 19
While opening an organization tree on the Manage Organization Trees page, you notice that the hierarchy status is displayed as Inactive. Identify the two reasons for the organization tree to be in Inactive status. ( Choose two.)
- A. You used Create Tree in the action menu.
- B. You used Create Tree Version in the action menu.
- C. You used View Tree Version in the action menu.
- D. You selected the Edit icon for opening the hierarchy.
- E. You opened the hierarchy by clicking the name.
Answer: AD
NEW QUESTION 20
Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified that their cost spread distribution factor on a 10 spread point scale resembles:
0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. (Choose two)
- A. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to a project template.
- B. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to the resource class.
- C. Use the predefined Bell Curve spread with small deviations on the spread points.
- D. Use the predefined S-Curve spread with small deviations on the spread points.
Answer: BC
NEW QUESTION 21
Identify the attribute of a project type that determines if expenditure items are billable, and the amount type to be used as the basis for transfer pricing. (Choose the best answer.)
- A. work type
- B. event type
- C. cost type
- D. expenditure type
Answer: A
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125361.htm#OAPFM1125277 (what’s a work type?)
In billing, you can use work types to classify work for the following purposes:
To determine the default billable status of expenditure items.
To classify cross-charge amounts into cost and revenue for cross-charge transactions.
Tip: To use work types to determine whether an expenditure item is billable you must set the profile option Work Type Derived for Expenditure Item to Yes.
When you create or import expenditure items, the default work type is inherited from the associated task. Tasks, in turn, inherit work type values from parent tasks and ultimately from the project. Project types determine the default work type value for projects and project templates.
NEW QUESTION 22
Which three are true of what you can do in the Project Requirements work area?
- A. Create an implementation project.
- B. Organize backlog items by requirements.
- C. Create an execution project.
- D. Create project tasks for backlog items.
- E. Manage your list of backlog items.
Answer: BDE
Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/manage-project-requirements.ht
Project Requirements: Explained
Requirements enable you to capture your business needs. If you manage projects using the Agile development methodology, you start by identifying the high-level requirements and decomposing them further to manage the completion of work on the requirement.
You use the Project Requirements work area to:
Organize backlog items by requirements
Manage your list of backlog items
Create project tasks for backlog items
NEW QUESTION 23
Your customer has different accounting and project accounting periods, and sometimes enters invoices with an invoice date in the open project accounting and closed accounting periods. Which two statements are true about how project accounting and accounting dates will be populated in such invoices? (Choose two.)
- A. Accounting date is the same as the original invoice date.
- B. Project accounting date is the same as the original invoice date.
- C. Project accounting date is the first day of the first open project accounting period.
- D. Project accounting date is the last day of the open project accounting period.
- E. Accounting date is the first day of the first open accounting period.
Answer: BE
NEW QUESTION 24
Select two correct statements about project classifications on a template. (Choose two.)
- A. Set Code is not required for a project class category in a project classification.
- B. Project Classification is a mandatory field on a project template.
- C. When a project is created from a template, the required project classifications must be entered.
- D. Project class category in a project classification must be associated with a Set Code.
Answer: AC
NEW QUESTION 25
......