Your success in APICS CPIM-BSP is our sole target and we develop all our CPIM-BSP braindumps in a way that facilitates the attainment of this target. Not only is our CPIM-BSP study material the best you can find, it is also the most detailed and the most updated. CPIM-BSP Practice Exams for APICS APICS Certification CPIM-BSP are written to the highest standards of technical accuracy.
Check CPIM-BSP free dumps before getting the full version:
NEW QUESTION 1
Which of the following techniques typically eliminates common errors?
- A. Practical kaizen training
- B. Kaizen
- C. Poka-yoke
- D. Kanban
Answer: C
NEW QUESTION 2
The ABC approach to inventory management is used primarily to:
- A. minimize transportation and material handling costs.
- B. classify inventory according to the total amounts of inventory required.
- C. optimize the amount of inventory for all classifications of inventory.
- D. establish the degree of inventory control required.
Answer: D
NEW QUESTION 3
Which of the following documents specifies how an item is to be manufactured?
- A. Routing
- B. Bill of labor
- C. Dispatch list
- D. Item master
Answer: A
NEW QUESTION 4
Which of the following differences must be taken into consideration when dealing with a global distribution system?
- A. Culture
- B. Cost
- C. Carriers
- D. Computer systems
Answer: A
NEW QUESTION 5
The question below is based on the following cost information:
What is the carrying cost?
- A. 14%
- B. 16%
- C. 20%
- D. 25%
Answer: D
NEW QUESTION 6
Which of the following circumstances will cause a decrease in a work center's utilization?
- A. Working overtime
- B. Working below standard
- C. Lack of materials
- D. Rework operations
Answer: C
NEW QUESTION 7
Earliest job due date is an example of:
- A. dispatching.
- B. infinite scheduling.
- C. a chase strategy.
- D. available-to-promise.
Answer: A
NEW QUESTION 8
Which of the following statements best describes an example of advance ship notice?
- A. An electronic data interchange communication indicating that an order has left the port of loading
- B. A person who handles international shipping documentation and transportation requirements
- C. A fee for material held at port longer than the standard unloading time
- D. A listing of the items included in an overseas shipment
Answer: A
NEW QUESTION 9
Which of the following capacity management techniques is used to support the production plan?
- A. Resource planning
- B. Capacity requirements planning
- C. Rough-cut capacity planning
- D. Input/output control
Answer: A
NEW QUESTION 10
Having bolts and tools at the point of use on the automobile assembly line eliminates the waste of :
- A. waiting.
- B. overproduction.
- C. making defects.
- D. stocks.
Answer: A
NEW QUESTION 11
Material requirements planning provides recommendations for which of the following processes?
- A. Shop orders and capacity
- B. Capacity and purchase orders
- C. Purchase orders and shop orders
- D. Routing and lead times
Answer: C
NEW QUESTION 12
Which of the following factors is included in cost of goods sold?
- A. Revenue
- B. General and administrative expenses
- C. Overhead
- D. Standard cost
Answer: C
NEW QUESTION 13
Characteristics that cause customers to consider a company's products or services are called:
- A. order qualifiers.
- B. order winners.
- C. product configurations.
- D. product specifications.
Answer: A
NEW QUESTION 14
Which of the following scheduling techniques reduces manufacturing lead times?
- A. Backward
- B. Finite
- C. Forward
- D. Overlapped
Answer: D
NEW QUESTION 15
Which of the following four plant types for the theory of constraints processes one raw material into one final product?
- A. V-plant
- B. A-plant
- C. T-plant
- D. I-plant
Answer: D
NEW QUESTION 16
Effective inventory management should lead to which of the following?
- A. Higher inventory turns
- B. Higher product quality
- C. Lower cost of capital
- D. Elimination of inventory cycle counting
Answer: A
NEW QUESTION 17
In the total cost concept, which of the following logistics costs should be considered when selecting a transportation mode?
- A. Import duty costs
- B. Receiving inspection costs
- C. Inventory purchasing costs
- D. Inventory carrying costs
Answer: D
NEW QUESTION 18
Which of the following functions of inventory is most likely to be included in a manufacturer's finished goods?
- A. Rework
- B. Work in process
- C. Anticipation
- D. Maintenance, repair, and operations supplies (MRO)
Answer: C
NEW QUESTION 19
After a quality improvement program has been successfully implemented, the greatest cost of controlling quality typically is the cost of:
- A. failure.
- B. appraisal.
- C. prevention.
- D. inspection.
Answer: C
NEW QUESTION 20
Which of the following information is the key output of rough-cut capacity planning?
- A. Line balancing
- B. Critical resource availability
- C. Inventory objectives by product line
- D. Capacity requirements plan
Answer: B
NEW QUESTION 21
Increasing sales through the Internet will result in an increased demand for reverse:
- A. auctions.
- B. engineering.
- C. flow scheduling.
- D. logistics.
Answer: D
NEW QUESTION 22
Gemba is a Japanese word meaning:
- A. shop floor.
- B. shop order.
- C. shop packet.
- D. shop traveler.
Answer: A
NEW QUESTION 23
Material requirements planning requires which of the following files to plan requirements?
- A. Standard cost
- B. Bill of materials
- C. Routing
- D. Work center
Answer: B
NEW QUESTION 24
Which method of record audit is concerned with the total value of inventory?
- A. Weight counts
- B. Cycle counts
- C. Physical inventory
- D. Sampling records
Answer: C