We provide real OG0-092 exam questions and answers braindumps in two formats. Download PDF & Practice Tests. Pass The-Open-Group OG0-092 Exam quickly & easily. The OG0-092 PDF type is available for reading and printing. You can print more and practice many times. With the help of our The-Open-Group OG0-092 dumps pdf and vce product and material, you can easily pass the OG0-092 exam.
Check OG0-092 free dumps before getting the full version:
NEW QUESTION 1
Scenario: Raxlon Inc.
Case Study Title (Case Study):
Raxlon Inc. is a Fortune 500 Company dealing in high value drugs and pharma products. Its annual turnover is over 120 billion $. It has more than 100,000 employees all over the globe in its R&D, Manufacturing and Marketing Units.
Raxlon’s CEO, Dr Peter Fowles, is a pharmacology expert and has over 72 patents on various types of drugs mainly used for treating patients with genetic disorders. Raxlon is now moving into a suite of high end critical drug products used for Genetic Repair of congenital Diseases like Alzhmeir’s disease and Epilepsy. Rexlon has a well developed EA practice and in 2009 the EA practice has adopted TOGAF 9 as the primary Framework for Enterprise Architectural Change Agent.
Dr Fowles’ main concerns are:
Security of the critical data which they have gained over the years after painstaking research. Although Rexlon had an adequate security system Dr Fowles feels it may not be adequate to deal with the new order of things, especially with data which is highly confidential and if leaked would have major financial impact on the Company.
Dr Fowles calls his CIO and explains his position to him and entrusts whim with the responsibly of evaluating the current security system, operation and governance and determine which are the gaps which need to be addressed during the fresh architectural work. Assume that a new Security Framework would be used in the ADM life cycle. To protect Rexlon’s valuable IP.
The CIO apprises the Lead Architect of the sensitive nature of the work he has to complete within the next 2 months.
Identify which of the following processes would be most appropriate for the Lead Architect to adopt in this situation.
- A. Identify the sources of threat, review the relevant security statutes, see how disaster recovery can be achieved, find who are the actors vis vis the system and design suitable access control mechanisms, identify critical data and applications and ensure that they are given the highest level of security
- B. First revisit the Preliminary Phase to determine the tailoring of ADM vis a vis Securit
- C. Identify any change in the Principles or additions to be carried ou
- D. Engage with all Stakeholders to finalize the Visio
- E. Then in Business, Information systems and Technology Architectures ensure the Security Frame work adopted to the ADM addresses all critical security issue
- F. Finally conduct an overall review to assess how effective the security ecosystem designed is and whether it meets the security level desired
- G. Invoke Preliminary Phase and Vision Phase Identify Sources of threat, review and determine revised regulatory, security and assumptions, document them get management buy in , develop business continuity plans especially for critical data operations, assure data, application and technological component security.
- H. Determine who are the people who are hacking into similar organizations, ensure that highly secure measures are taken when external people enter the R&D and manufacturing locations, ensure that there is a very strong firewall so that people cannot get illicit entry into the system, periodically check the effectiveness of the security measures
Answer: A
NEW QUESTION 2
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.
At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the
security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Scenario
During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.
You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.
Based on TOGAF 9, which of the following is the best answer?
- A. The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholder
- B. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.
- C. The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier lis
- D. Based on the findings from the research, the team should define a preliminary Architecture Visio
- E. The team should then use that model to build consensus among the key stakeholders.
- F. The team should use stakeholder analysis to understand who has concerns about the initiativ
- G. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario techniqu
- H. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.
- I. The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholder
- J. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.
Answer: C
NEW QUESTION 3
Scenario: Florian Flowers BV
Please read this scenario prior to answering the question
Florian Flowers BV is an international agricultural company exporting flowers and seeds worldwide. Florian is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in over 60 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.
To achieve full integration of their research capabilities with their development centers located in various climate zones, Florian wants to develop strong self-directed teams in each location. Florian also wants to define new business models that are profitable while reducing their impact on the environment. Florian management is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.
Florians international operations are subject to various legal and regulatory requirements. In areas such as genetically modified seeds, governmental controls are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.
The Governing Board is concerned, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the guiding framework for the development and evolution of the Enterprise Architecture practice.
Refer to the Florian Flowers BV Scenario
Florian management has engaged you as the Lead Consultant to assess the current situation.
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of all these parties.
Based on TOGAF 9, which of the following is the best answer?
- A. Depending on the nature of the architecture, a set of models should be created that can be used to ensure that the system will be compliant with the local regulation
- B. Stakeholders should be able to view the models to see that their concerns have been properly addressed.
- C. Each architecture activity should be developed using a consistent modeling approach that is uniform across all architecture project
- D. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been accessed.
- E. For those groups that have sufficient power and level of interest, a special report should be created that summarizes the key features of the architecture with respect to the particular locatio
- F. Each of these reports should reflect the stakeholders' requirements.
- G. It would be beneficial to develop a stakeholder map that allows the architects to define groups of stakeholders that share common concern
- H. A set of views should be defined that addresses the concerns each grou
- I. Architecture models can then be created for each view to address the stakeholders' concerns.
Answer: A
NEW QUESTION 4
Worldwide Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new finding about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. WorldwideMobile actually has better coverage in nearly all markets than Air Light, and good roaming agreement that keep rates low for business travellers. But customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. WorldwideMobile has selected TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Executive Council has stated that the program should define specific initiatives to enable each regional business units to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to WorldwideMobile-2 Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At present time, the project team is conducting an architecture development project that is focused on the customer self service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project. Based on TOGAF 9, which of the following is best answer?
- A. In the remaining architecture definition phases, the project team should map out the capability in the Technology domai
- B. In the Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architectur
- C. Where possible, the Solution Building Blocks should be drawn from the Architecture Repositor
- D. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approva
- E. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.
- F. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domain
- G. In the Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architectur
- H. The resulting Solution Building Blocks will then provide the basis for the capability increment solution
- I. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approva
- J. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conduction Compliance Assessments.
- K. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domain
- L. In the Phases E and F, the capability should be broken down into a set of increments that defines the Target Architectur
- M. The Solution Building Blocks will provide the basis for the capability increment solution
- N. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approva
- O. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.
- P. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domai
- Q. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architectur
- R. The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approva
- S. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
Answer: B
NEW QUESTION 5
Scenario: St. Croix Consulting
Please read this scenario prior to answering the question
St. Croix Consulting started as an accounting and financial services company. It has expanded over the years and is now a leading North American IT and Business Services provider.
With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings. Senior partners must become team players, working to support the broader needs of the company and its shareholders.
The Enterprise Architecture team has been working to create St. Croixs Enterprise Architecture framework to address these issues. The team has defined a preliminary framework and held workshops with key stakeholders to define a set of principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period.
An Architecture Review Board has been formed comprised of IT staff executives and executives from the major practice areas.
The Enterprise Architecture framework is based on TOGAF 9.
The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of the Enterprise Architecture program.
Refer to the St Croix Consulting Scenario:
You have been assigned to the role of Chief Enterprise Architect.
As the EA team prepares to formulate an Implementation plan, they have been asked by the CIO to assess the risks associated with the proposed architecture. He has received concerns from senior management that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.
You have been asked to recommend an approach to satisfy these concerns. Based on TOGAF 9, which of the following is the best answer?
- A. An interoperability analysis should be applied to evaluate any potential issues across the Solution Architectur
- B. Once all of the concerns have been resolved, the EA team shouldfinalize the Architecture Implementation Roadmap and the Migration Plan.
- C. The EA team should gather information about potential solutions from the appropriate source
- D. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.
- E. Prior to preparing the Implementation plan, the EA team should create a consolidated gap analysis to understand the transformations that are required to achieve the proposed Target Architectur
- F. The EA team should gather information about potential solutions from the appropriate source
- G. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architecture
- H. An interoperability analysis should be applied to evaluate any potential issues across the Solution Architecture.
- I. Prior to preparing the Implementation plan, there are several techniques that should be applied to assess the risks and value of the proposed transformatio
- J. In particular, the EA team should pay attention to the Business Transformation Readiness Assessment and the Business Value Assessment.
Answer: C
NEW QUESTION 6
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Rollins Enterprise Architecture department has been operating for several years and
has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Rollins Manufacturing Scenario:
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.
One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.
[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.]
Based on TOGAF 9, which of the following is the best answer?
- A. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
- B. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.
- C. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
- D. Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
Answer: C
NEW QUESTION 7
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The decision has been made to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing Architecture Development Method (ADM) projects.
At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving existing processes or systems.
The architect-re development project has put in place Its Architecture Capability for this project and has started a number of iteration cycles to develop the Architecture. Some tasks to address concerns related to the Business Architecture have been completed. The next immediate task is to address the Information Systems Architectures.
The Information Systems Architectures must address stakeholder concerns such as:
1. Which procurement-related business processes are supported by zero, one, or many existing applications?
2. What non-procurement applications will need to be integrated with any new procurement applications?
3. What data will need to be shared? Refer to the Scenario
[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]
You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.
Based on TOGAF 9, which of the following is the best answer?
- A. in the early iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture using a Data Entity/Data Component catalo
- B. In the later Iterations of the Architecture Definition, you would describe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matrix.
- C. In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a System/Data matri
- D. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component catalog.
- E. In the early iterations of Architecture development, you would describe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrix, and describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data matri
- F. In the later iterations of Architecture development, you would describe the Baseline Application Architecture with a System/Function matrix, and describe the Baseline Data Architecture with a Data Entity/Data Component catalog.
- G. In the early iterations of Architecture development, you would describe the Baseline Application Architecture with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a Data diagra
- H. In the later iterations of Architecture development, you would describe the Target Application Architecture with a System/Technology matrix, and describe the Target Data Architecture with a Data Dissemination diagram.
Answer: C
NEW QUESTION 8
Scenario: Eight Twelve
Eight Twelve has retail outlets throughout North America. An Enterprise Architecture practice already exists in Eight Twelve. Now the CEO and CIO decide that they want to use TOGAF9 to re-architect their Enterprise Architecture to cater to the changing strategies of Eight Twelve to better respond to the changes in the economic and technology environments.
Some of the key issues which need to be addressed in this re-architecting work are:
1. Since Eight Twelve’s retail chain operate 24 hours a day and are expanding to South America and Europe, the retail chain business ecosystem should be able to withstand any unforeseen disruptions which might affect the chain’s day to day operations. This is highly critical to ensure high levels of customer satisfaction and thus maintaining and enhancing Eight Twelve’s revenue chain.
2. Dependency between the application components, which are the nerve centers to Eight Twelve’s sophisticated range of services both external and internal, and the application platform and technology infrastructure should be minimal. This would facilitate scalability and ease of enhancement of the service offerings.
3. Eight Twelve uses the ARTS Data Model and the quality of data is of utmost importance for its operation.
4. Users of the Enterprise Information ecosystem should have an environment which is able to cater to their needs without any undue delays.
Which one of the following set of Architecture Principles do you feel is the most appropriate for these guidelines stated above for the TOGAF 9 architecting work which Eight Twelve is embarking on?
- A. a) Maximize Benefit to the Enterprise b).Data Trusteec) Service Orientationd) Responsive Change Management
- B. a) Business Continuity b).Data is an Assetc) Data is Sharedd) Requirements Based Change
- C. a) Maximize Benefit to the Enterprise b).Data is an Assetc) Data is Sharedd) Requirements Based Change
- D. a) Business Continuity b).Data Trusteec) Technology Independenced) Responsive Change Management
Answer: D
NEW QUESTION 9
McKinley Rockets is an enterprise that employs 20,000 men and women in five countries: UK, Italy, France, Spain and the Netherlands and its mission is to guarantee access to space offering space transportation, launch and management of satellite systems at low cost.
A TOGAF 9 mature Enterprise Architecture program is already established within the enterprise. McKinley Rockets strategy is to leverage in the USA shortage of satellite launches availability - that NASA created because of the Shuttle program shutdown - by acquiring an important merican space agency. This will ultimately allow McKinley Rockets to offer its services to the US market. The new acquired company NovaSpace is very successful but with outdated satellite monitoring systems. The
CIO is sponsoring an activity to extend the McKinley Rockets' satellite monitoring applications to include the NovaSpace's satellites flock.
A task force of enterprise architects prepared an Architecture Vision and secured the approval. The
Architecture Board decided to approve the vision, provided that the Design Definition Document is presented
for review at phase D conclusion. Refer to the scenario above
The Chief Architect asked you as Lead Integration Architect to use TOGAF 9 to recommend the best approach to design the Full Architecture and present it to the Architecture Board.
Identify the best answer accordingly to the TOGAF 9 guidelines. Choose one of the following answers
- A. You start with the Business Architecture and then address Technology, Application and Data domain
- B. For every domain you select the relevant reference models, viewpoints, and tool
- C. You develop a Target and Baseline Architecture Description
- D. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadma
- E. Finally update the Architecture Definition Document.
- F. You start with the Business Architecture and then address Data, Application and Technology domain
- G. You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projects through the conduct of a cost/benefit assessment and risk validatio
- H. Then perform GapAnalysis and update the Architecture Definition Document.
- I. You start with the Business Architecture and then address Data, Application and Technology domain
- J. For every domain you select the relevant reference models, viewpoints, and tool
- K. You develop a Baseline and Target Architectur
- L. Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.
- M. You start with the Business Architecture and then address Data, Application and Technology domain
- N. For every domain you develop a Baseline and Target Architectur
- O. Then perform Gap Analysis and update the Architecture Definition Document.
Answer: C
NEW QUESTION 10
TP Banking is a strong financial institute with a well-known acquisition history with an internal IT department managing over 100 projects related to infrastructure and services.
The CIO has decided to create an Enterprise Architecture based on TOGAF 9 as reaction to the difficult market conditions. An Architecture Vision and a set of domain architectures were approved. The CIO is asking you (the Lead Architect) to define an Implementation and Migration Plan that realizes the vision already agreed with the stakeholders involved.
Refer to the scenario above
You are leading a group of domain architects and you are working with the corporate PMO, the business strategy team and service operations. You are meeting the stakeholders to clarify how you want to proceed with the Implementation and Migration Plan.
Choose one of the following answers
- A. You propose to start collecting the existing deliverables describing the different domains in order to enable the Enterprise Architecture tram to integrate them with the support of the operation managemen
- B. Every domain architect will then evaluate the impact on the projects already planned for the domai
- C. The single revised plans will be integrated together and consolidated into a strategic implementation and migration strategy defining an IT roadmap.
- D. You communicate the need for urgenc
- E. The projects already planned will be cancelled and the implementation of the new architecture vision will be set as first priorit
- F. A set of new projects will be defined to implement the new strateg
- G. You will use the requirements from Phases B through D and define new projects for each one of the requirement
- H. The use of defined interoperability architecture guidelines will then enable the project teams to work together and define a set of new point-to-point interfaces.
- I. You describe the concept of Transition Architectures and clarify that the business value can be achieved by all the projects delivering their increments in a coordinated approac
- J. Capability gaps and project dependencies are analyzed for each domain this will then enable the projects to be organized in work package
- K. You will then agree on the roadmap for the implementation and migration strategy meeting with all the key stakeholders.
- L. You communicate the CIO's will to transform the corporation and then that he's seeking help from the domain architects to do tha
- M. The requirements are managed in order to enable every Architect to participate to the planning that will result in a detailed list of work activities with impact on the IT portfolio of project
- N. A five year Target Architecture will then be defined and a report will keep track of dependencies and factors assessment.
Answer: C
NEW QUESTION 11
Dante Manufacturing is a big supplier in the automotive industry, head quarter in London with main plants in New York, Milan, Toronto and Tokio. Each one of these plants has been operating its own Manufacturing Requirements Planning (MRP II) system, production scheduling and custom applications for production automation. Dante's objective is to minimize waste production improving production operations. During an analysis of the
process improvements was determined that a significant improvement on waste production could be achieved replacing the outdated MRPII system with a common Enterprise Resource Planning (ERP) located in London. Dante has well-developed governance and processes based on TOGAF 9. The Chief Engineer of Global Manufacturing operations is the business sponsor and issued a Request for Architectural Work. The architectural activity for the implementation of the new ERP platform is kicked off and the architectural vision is produced. Some concerns on the security, reliability, responsibility and time to manage change of driving the MRP II and production scheduling by a central system located in London are raised by the team of architects working on the project and by senior management of the various organizations. These last in particular, stressed the need to align the information management with the business.
Refer to the scenario above As Lead Architect you have been asked to update the IT architectural principles to address the concerns raised by the project stakeholders and the senior management. According to TOGAF 9 (assuming the enterprise is using the example set of principles in TOGAF 9 Section 23.6), which of the following is the best answer?
Choose one of the following answers
- A. Common Use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control, Technology Independence.
- B. Business Continuity, Service-Orientation, Data is Shared , Data is Accessible, Data is Secure, Responsive Change Management.
- C. Requirements-Based Change, Ease-of-Use, Data is Normalized.
- D. Information Management is Everybody's business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
Answer: D
NEW QUESTION 12
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large- scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross- functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and
deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?
- A. You create an Architecture Contract to manage and govern the implementation and migration proces
- B. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
- C. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local need
- D. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
- E. You create an Architecture Contract to manage and govern the implementation and migration proces
- F. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
- G. For internal envelopment projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
- H. You create an Architecture Contract to manage and govern the implementation and migration proces
- I. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
- J. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- K. You create an Architecture Contract to govern the implementation and migration process at each sit
- L. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
- M. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management.You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definitio
- N. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
Answer: C
NEW QUESTION 13
An international Insurance company has grown with little consideration for rationalization and consolidation. There is no coordination between business unit and every one have managed its own applications. The CIO decided to establish an Enterprise Architecture program within the enterprise to enable the company to expand to other markets in the next two years. The company has not any Enterprise Architecture Capability in place and the he CIO has set up an Architecture Board and called its first meeting. Refer to the scenario above
As Lead Architect you will establish a TOGAF 9 Enterprise Architecture program. Identify the best way to do this among the answers below.
Choose one of the following answers
- A. You tailor TOGAF 9 with the help of the Architecture Board to integrate it with the legacy procedures established by the PM
- B. You also examine the relationship of TOGAF with other processes and frameworks for governance, systems development and operations managemen
- C. You then define the footprint of the enterprise architecture.
- D. As Lead Architect you create a Request for Architecture Work to allocate resources to work on the Architecture Visio
- E. Based on the outcome of the Business Scenario technique you apply, you create the Common Systems Architecture to guide the choice of Solutions Building Block
- F. These will be then used for integrating the systems across business units.
- G. You clarify the agreement on key business drivers and the scope of the enterprise architectur
- H. You then clarify the requirements for architecture wor
- I. You define the architecture principles together with the help of the Architecture Board in order to lead the architecture wor
- J. You consider how to tailor TOGAF 9 for this enterprise.
- K. You conduct an Architecture Maturity Assessmen
- L. You then use the TOGAF ADM to state the requirements for the integration of a new company information management system into the organizatio
- M. You then list a set of business goals together with theArchitecture Board that will be a reference to the enterprise architecture program.
Answer: C
NEW QUESTION 14
FreshFruit Int. is an online American grocer. The Executive Board decided to implement a new strategy to expand the business to other markets.
The CIO is sponsoring an enterprise activity to support the expanded operations.
A new solution is rolled-out to replace the legacy online sales platform. A compliance review was performed to assess the solution implementation.
The result of the review highlighted a complaint from the development team stating that the new system is difficult to integrate with the existing warehouse automation systems. The Chief Architect is concerned that the complaint is not related to a real problem of the solution but is based on personal preferences of the development teams. Another interview with the project team is scheduled.
Refer to the scenario above You are the Lead Architect and an architect from your team leads the review team. You have to answer how, based on TOGAF 9, you should enable the review team to conduct the reviews successfully.
Choose one of the following answers
- A. Meeting with the project architect you clarify the purpose of the revie
- B. You ask to perform an objective and fair review using the checklists to frame the review and clarify that you want them to identify the issues behind the implementation team complaints.
- C. You organize a meeting with the review team and state the importance to identify any non-compliancy that may have come from the implemented solution.
- D. You organize a meeting with the review team and stress the importance of a high degree of compliance without any exceptio
- E. The review should cover every aspect of the implementation and should criticize the implementation techniques.
- F. You verify that criteria for the program and the business objectives are mapped in the checklists that the project team prepared for the interview
- G. You confirm the checklist content to the project architect and stress the need to be objective and fair during the review process.
Answer: D
NEW QUESTION 15
Scenario: MegaMart
Case Study Title (Case Study):
MegaMart is a Retail Chain which has expanded throughout India and the Far East. The CEO and CIO decide that there is a crying need to put an Enterprise Architecture in
place to realize MegaMart’s strategy to expand its revenue and diversify. The CIO has evaluated and decided to go in for TOGAF9 and adapt it to his enterprise requirements.
The Preliminary and Vision Phase have been completed.
As such very few architectural artifacts exist and the target architecture as of now is not very clear. As the Lead Architect how would you guide your team of architects for the Business Architecture definition?
- A. In the first iteration start with the definition of the Target Business Architecture using a Top down Approach.Then keep on iterating in Phase B till the Target Business Architecture is refined before going to Phase C and Phase
- B. After Phase C and Phase D are over, iterate again to Phase B and define the baseline Business Architecture, analyze the gaps finalize the Architecture Definitions documents and proceed to Phase C and Phase D.
- C. In the first iteration start with the definition of the Baseline Business Architecture using a Top Down approac
- D. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholder
- E. Then proceed to Phase C and Phase
- F. In the next iteration finalize the Target Business Architecture and proceed to Phase C and Phase D.
- G. In the first iteration start with the definition of the Baseline Business Architecture using a Bottom Up approac
- H. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders’.Proceed to Phase C and Phase
- I. In the next iteration finalize the Target Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition documen
- J. after analyzing the impacts and reviewing with the stakeholder
- K. Then proceed with the iteration.
- L. In the first iteration start with the definition of the Target Business Architecture using a Top Down approac
- M. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders proceed to Phase C and Phase
- N. In the next iteration finalize the Baseline Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition documen
- O. After analyzing the impacts and reviewing with the stakeholder
- P. Then proceed with the iteration.
Answer: C
NEW QUESTION 16
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.
Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.
The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company
has an existing team of security architects.
TOGAF 9 has been selected for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.
Refer to the Scenario
In the Preliminary Phase you need to define suitable policies and ensure that the company has the appropriate capability to address the concerns of the Corporate Board.
Based on TOGAF 9, which of the following is the best answer?
- A. You start by clarifying the intent that the Board has for raising these concern
- B. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objective
- C. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture and that this be considered an additional domain architecture.
- D. You evaluate the implications of the Board's concerns by examining the security and regulatory impacts on business goals, business drivers and objective
- E. Based on your understanding, you then update the current security policy to include an emphasis on the concern
- F. You define architecture principles to form constraints on the architecture work to be undertaken in the projec
- G. You then allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.
- H. You identify and document the security and regulatory requirements for the application and the data being collecte
- I. You ensure that written policies are put in place to address the requirements, and that they are communicated across the organization, together with appropriate training for key employee
- J. You identify constraints on the architecture and communicate those to the architecture tea
- K. You establish an agreement with the security architects defining their role within the ongoing architecture project.
- L. You evaluate the implications of the concerns raised by the Corporate Board in terms of regulatory requirements and their impact on business goals and objective
- M. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the concern
- N. You allocate a security architect to oversee the implementation of the new application that is being developed.
Answer: C
NEW QUESTION 17
SureFlight Air Carrier has received approval for the acquisition of a regional carrier.
To integrate the new acquisition, a TOGAF based enterprise architecture program has been initiated. The CIO sponsors the activity supported by the Chief Architect.
In Phase A within the initial iteration the CIO wants to ensure that the architecture activities are recognized among the various stakeholders of the enterprise.
Refer to the scenario above
You are a consultant supporting the Chief Architect that should explain how to identify and engage the stakeholders at this stage of the program.
Identify the best answer accordingly to the TOGAF 9 guidelines. Choose one of the following answers
- A. Using the business scenarios technique you would identify supporting and not supporting stakeholders.Then you would list the set of viewpoints that are addressing the stakeholder concerns andshare these with them.
- B. You first priority is to communicate with the regional carrier stakeholders developing a CommunicationsPlan to share main features and discuss opportunities with them.
- C. You conduct a pilot proof of concept during Phase A to demonstrate the technical feasibility to the stakeholders explaining the approach available from your preferred suppliers.
- D. You identify all the main stakeholders on both the acquired carrier and the rest of the enterpris
- E. Using a stakeholder map, you classify and record their power in relation to this activit
- F. You then focus on implementing the relevant viewpoints that can address the concerns of every main stakeholder identified in the stakeholders map.
Answer: D
NEW QUESTION 18
Scenario:
Please read this scenario prior to answering the question
Your role is consultant to the Lead Architect within a company that manufactures a variety of small electromechanical devices. As part of a corporate-wide Lean Manufacturing initiative, the company has defined a strategic architecture to improve its ability to meet consumer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in several of the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.
The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.
Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.
The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A. Based on all of these factors they have produced a risk assessment.
Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
Refer to the Scenario
The Implementation and Migration Plan v0.l, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete. You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
Based on TOGAF 9, which of the following is the best answer?
- A. You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increment
- B. The assessment should focus on return oninvestment and performance evaluation criteria that can be used to monitor the progress of the architecture transformatio
- C. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the project
- D. You would then document the lessons learned and generate the final plan.
- E. You would assess how the plan impacts the other frameworks in use in the organizatio
- F. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management framework
- G. You would then assign a business value to each project, taking into account available resources and priorities for the project
- H. Finally, you would generate the Implementation and Migration Plan.
- I. You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contrac
- J. The Compliance Assessment should verify that the implementation team is using the proper development methodolog
- K. It should include deployment of monitoring tools and ensure that performance targets are being me
- L. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
- M. You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycl
- N. This will ensure that the architecture remains relevant and responsive to the needs of the enterpris
- O. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the pla
- P. You recommend that lessons learned be accepted by the Architecture Board as changes to the architecture without review.
Answer: B
NEW QUESTION 19
Scenario: AGEX Inc.
Please read this scenario prior to answering the question
AGEX is a large, global commodities trading company which has been growing rapidly through a series of acquisitions.
Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different
ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, AGEX has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business. The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture.
After reviewing the available alternatives, and based on recommendations from the ERP vendor, AGEX has selected TOGAF 9 as the basis for its Enterprise Architecture program.
The CIO has endorsed this choice with the full support of top management. Refer to the AGEX Inc. Scenario
You are serving as the Chief Architect.
You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the Corporate Board's concern is addressed.
Based en TOGAF 9, which of the following is the best answer?
- A. You evaluate the implications of the Board's concern in terms of regulatory and security policy requirement
- B. You then update the AGEX security policy to reflect the concern, ensuring that this policy is communicated across the organization.You allocate a security architecture team to ensure that security considerations are included in ongoing architecture plannin
- C. You then assess the security implications and agreements within the AGEX businesses and their suppliers.
- D. You evaluate the implications of the Board's concern in terms of regulatory requirements and their impact on business goals and objective
- E. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the Board's concern.You allocate a security architect to oversee the implementation of the solution in the ERP system that is being developed.
- F. You start by clarifying the intent that the Board has for raising this concer
- G. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objectives.You propose that a security architect or security architecture team be allocated to develop comprehensive security architecture.
- H. You evaluate the implications of the Board's concern by examining the potential impacts on business goals and objective
- I. Based on your understanding, you then update the current AGEX security policy to include an emphasis on the Board's concern.In addition, you allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.
Answer: A
NEW QUESTION 20
Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Lead Enterprise Architect for a manufacturing firm that specializes in musical instruments. The firm has been established for over 100 years, operating in North America for most of that time. In the last ten years, the firm has expanded into European markets and will soon establish a market in Latin America. A future expansion into the Asia Pacific region is also planned.
The firm is organized into several business units that each focus on manufacturing particular families of instruments such as brass, woodwind, and percussion. Each business unit has acquired other producers to expand its manufacturing capacity. This has resulted in a complex environment with a high diversity of business and manufacturing systems.
The Enterprise Architecture (EA) program within the firm has been functioning for several years. It has made significant progress in consolidating the technology portfolio and establishing key standards. The CIO and the COO are pint sponsors of the EA program. The EA program is mature, with an active Architecture Board and a well-defined architecture process and standard content templates based on the TOGAF 9 Architecture Content Framework. The EA process framework is well coordinated with the PMO, Systems Development, and Operations functions.
The firm has completed a strategic plan to reorganize its Sales & Marketing organization according to the four target geographic markets. One of the goals of this reorganization is to improve the ability of Marketing to collect more meaningful market analytics that will enable each sector to better address market needs with effective marketing campaigns and global product presence.
A Request for Architecture Work to address the goals of the reorganization has been approved. As the architecture team commences its work, the CIO has expressed concerns about whether the firm will be able to adapt to the proposed architecture and how to manage the associated risks.
Refer to the Scenario
You have been asked how to address the concerns of the CIO. Based on TOGAF 9, which of the following is the best answer?
- A. In Phase B, the team should create a set of views that will enable them to identify the factors that will influence the successful introduction of the architecture into the organizatio
- B. There should then be an assessment of each factor on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fi
- C. Thesefactors can then be used to assess the initial risks associated with the proposed architecture.
- D. In Phase A the team should analyze their risk by completing an Implementation Factor Assessment and Deduction Matrix to identify the particular risks associated with the implementation and deploymen
- E. The matrix should include a list of factors to be considered, their descriptions, and constraints that should be taken into accoun
- F. These factors can then used to assess the initial risks associated with the proposed architecture.
- G. In Phase A, the team should use the Business Transformation Readiness Assessment technique to identify the factors that will influence the successful introduction of the architecture into the organizatio
- H. The assessment should include determining the readiness rating for each factor based on a maturity scale that will allow the team to gauge the urgency, readiness, and degree of difficulty to fi
- I. These factors can then used to assess the initial risks associated with the proposed architecture.
- J. In Phase A, the team should conduct a Business Scenario to identify the stakeholders' concerns and the resulting retirement
- K. Once the retirements have been identified, they can be assessed in terms of their risk
- L. The risks should be evaluated in terms of how they could be avoided, transferred, or mitigate
- M. Any risks that cannot be resolved should be identified as residual risks and their disposition should be decided by the Architecture Board.
Answer: C
NEW QUESTION 21
......
100% Valid and Newest Version OG0-092 Questions & Answers shared by Allfreedumps.com, Get Full Dumps HERE: https://www.allfreedumps.com/OG0-092-dumps.html (New 48 Q&As)