Top Tips Of Leading CLSSGB Exam Question

Want to know Testking CLSSGB Exam practice test features? Want to lear more about GAQM Certified Lean Six Sigma Green Belt (CLSSGB) certification experience? Study Actual GAQM CLSSGB answers to Leading CLSSGB questions at Testking. Gat a success with an absolute guarantee to pass GAQM CLSSGB (Certified Lean Six Sigma Green Belt (CLSSGB)) test on your first attempt.

Online CLSSGB free questions and answers of New Version:

NEW QUESTION 1
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart

Answer: A

NEW QUESTION 2
The proper functioning of a Visual Factory is dependent upon which of these?

  • A. Technically skilled workers
  • B. Work space with active 5S
  • C. Availability of visual tools
  • D. Breakthrough projects

Answer: C

NEW QUESTION 3
Measurement System Analysis is a procedure used to quantify all __________ in the method or system used for taking measurements.

  • A. Totals
  • B. People involved
  • C. Variation
  • D. Summations

Answer: C

NEW QUESTION 4
According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. If the Standard Deviation is uncontrollable then the other option to increase the probability of coming in on time via personal vehicles to work could be __________?

  • A. Increase the average time of commute
  • B. Maintain the average time of commute and change route to work
  • C. Reduce average commute time to work by departing earlier
  • D. Change policy at work and request for flexible times based on location

Answer: C

NEW QUESTION 5
SPC charts typically have the most recent data point on the right hand side.

  • A. True
  • B. False

Answer: A

NEW QUESTION 6
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are __________ correlated?

  • A. Positively
  • B. Not
  • C. Negatively
  • D. None

Answer: C

NEW QUESTION 7
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.

  • A. Kanban
  • B. Kaizen
  • C. Poke-Yoke
  • D. WhoSai

Answer: A

NEW QUESTION 8
The purpose of a Process Map is to identify the complexity of the process and to record all actions and decision points in the process.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as __________.

  • A. Repeatability
  • B. Bias
  • C. Linearity
  • D. Reproducibility

Answer: A

NEW QUESTION 10
The difference between the largest observation and the smallest observation in the data set is known as the __________.

  • A. Breadth
  • B. Range
  • C. Spread
  • D. Median

Answer: B

NEW QUESTION 11
The acronym for the defined approach taken by Lean Six Sigma to solve significant challenges related to a process is which of these?

  • A. DOE
  • B. DMAIC
  • C. SIPOC
  • D. FMEA

Answer: B

NEW QUESTION 12
If the data displayed in a Histogram displays two peaks the distribution would likely be __________.

  • A. Transformed
  • B. Multi-skewed
  • C. Bi-attribute
  • D. Bimodal

Answer: D

NEW QUESTION 13
Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.

  • A. True
  • B. False

Answer: B

NEW QUESTION 14
The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.

  • A. True
  • B. False

Answer: A

NEW QUESTION 15
The higher the sigma level of a process the better the performance.

  • A. True
  • B. False

Answer: A

NEW QUESTION 16
In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?

  • A. 12 months
  • B. 24 months
  • C. The remainder of the calendar year
  • D. The remainder of the fiscal year

Answer: A

NEW QUESTION 17
The Mann-Whitney Test is used to test if the Means for two samples are different.

  • A. True
  • B. False

Answer: B

NEW QUESTION 18
Select all the statements that are true after reviewing the Capability Analysis shown here. (Note: There are 4 correct answers).

  • A. The process is out of Control.
  • B. The process is properly assumed to be a Normal process.
  • C. The Mean of the process moving range is 1.78.
  • D. This Capability Analysis used subgroups.
  • E. Majority of the dimensional values are outside of the tolerance than within.

Answer: BCDE

NEW QUESTION 19
Which element of waste best describes "the unnecessary movement of materials and/or goods"?

  • A. Overprocessing
  • B. Motion
  • C. Conveyance
  • D. Correction

Answer: C

NEW QUESTION 20
The following Business Case is constructed properly.
“During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”

  • A. True
  • B. False

Answer: A

NEW QUESTION 21
......

100% Valid and Newest Version CLSSGB Questions & Answers shared by DumpSolutions.com, Get Full Dumps HERE: https://www.dumpsolutions.com/CLSSGB-dumps/ (New 200 Q&As)