NEW QUESTION 1
Information distribution involves making needed information available to project stakeholders in a timely manner. What is an output from information distribution?
- A. Earned value analysis
- B. Trend analysis
- C. Project records
- D. Performance reviews
Answer: C
NEW QUESTION 2
Which of the following characteristics are found in a functional organizational structure?
- A. Little or no project manager authority, little or no resource availability, and the functional manager controls the project budget
- B. Limited project manager authority, limited resource availability, and a part-time project manager's role
- C. Low to moderate project manager authority, low to moderate resource availability, and a full-time project manager's role
- D. High to almost total project manager authority, high to almost total resource availability, and full-time project management administrative staff
Answer: A
NEW QUESTION 3
Which of the following is an example of schedule compression?
- A. Activity sequencing
- B. Resource leveling
- C. Lead and lag adjusting
- D. Crashing
Answer: D
NEW QUESTION 4
Which of the following is an example of push communication?
- A. Intranet sites
- B. Video conferencing
- C. Knowledge repositories
- D. Press releases
Answer: D
NEW QUESTION 5
Which of the following is an input to Direct and Manage Project Execution?
- A. Requested changes
- B. Approved change requests
- C. Work performance information
- D. Implemented defect repair
Answer: B
NEW QUESTION 6
Tools and techniques used for Plan Communications include the communication:
- A. requirements analysis, communication technology, communication models, and communication method
- B. methods, stakeholder register, communication technology, and communication model
- C. requirements, communication technology, communication requirements analysis, and communication method
- D. management plan, communication technology, communication models, and communication requirements analysi
Answer: A
NEW QUESTION 7
Which statement is true about the project management body of knowledge?
- A. Recognized by every project manager
- B. Constantly evolving
- C. The sum of all knowledge related to project management
- D. A sum of knowledge that should be applied on every project
Answer: B
NEW QUESTION 8
The following is a network diagram for a project.
What is the critical path for the project?
- A. A-B-C-F-G-I
- B. A-B-C-F-H-I
- C. A-D-E-F-G-I
- D. A-D-E-F-H-I
Answer: A
NEW QUESTION 9
While implementing an approved change, a critical defect was introduced. Removing the defect will delay the product delivery. What is the MOST appropriate approach to managing this situation?
- A. Utilize the change control proces
- B. Crash the schedule to fix the defec
- C. Leave the defect in and work around i
- D. Fast-track the remaining developmen
Answer: A
NEW QUESTION 10
The three types of estimates that PERT uses to define an approximate range for an activity’s cost are:
- A. Parametric, most likely, and analogou
- B. Least likely, analogous, and realisti
- C. Parametric, optimistic, and pessimisti
- D. Most likely, optimistic, and pessimisti
Answer: D
NEW QUESTION 11
What is the estimate at completion (EAC) if the budget at completion (BAC) is $100, the actual cost (AC) is $50, and the earned value (EV) is $25?
- A. $50
- B. $100
- C. $125
- D. $175
Answer: C
NEW QUESTION 12
Activity resource requirements and the resource breakdown structure (RBS) are outputs of which Project Time Management process?
- A. Control Schedule
- B. Define Activities
- C. Develop Schedule
- D. Estimate Activity Resources
Answer: D
NEW QUESTION 13
Which of the following can be used as an input for Define Scope?
- A. Product analysis
- B. Project charter
- C. Scope baseline
- D. Project scope statement
Answer: B
NEW QUESTION 14
The product scope description is used to:
- A. Gain stakeholders support for the projec
- B. Document the characteristics of the produc
- C. Describe the project in great detai
- D. Formally authorize the projec
Answer: B
NEW QUESTION 15
When does Monitor and Control Risks occur?
- A. At project initiation
- B. During work performance analysis
- C. Throughout the life of the project
- D. At project milestones
Answer: C
NEW QUESTION 16
Which of the following processes audits the quality requirements and the results from quality control measures to ensure appropriate quality standards and operational definitions are used?
- A. Perform Quality Control
- B. Quality Metrics
- C. Perform Quality Assurance
- D. Plan Quality
Answer: C
NEW QUESTION 17
Which type of estimating is used to improve the accuracy of an activity's duration?
- A. Analogous
- B. Parametric
- C. Three-point
- D. What-if scenario analysis
Answer: C
NEW QUESTION 18
What quality control tool graphically represents how various elements of a system interrelate?
- A. Control chart
- B. Flowchart
- C. Run chart
- D. Pareto chart
Answer: B